Tamar Way
- Tottenham Hale, London
- Category: Floors
- Product: Elastadeck
- Sector: Social Housing
- Guarantee: 15 years
- Coverage Area: 600m2
Before the correct coating system could be specified, Tor Coatings carried out a comprehensive free survey of the site to ensure every aspect of the project was clearly understood and all defects were documented thoroughly. The communal walkways at Tamar Way required a warrantied waterproofing solution with an anti-slip finish to ensure the safety and security of residents, while causing as little disruption as possible during installation.
The Elastadeck™ system by Tor Coatings was recommended and a specification was prepared and tendered. Elastadeck’s low odour, fast-cure formula provides an effective waterproofing system combined with a highly durable, slip-resistant finish. This purpose-built product allows quick and efficient installation on site, requiring less coats and less disruption to the residents at Tamar Way.
The project was undertaken by Tor with our Tor Partner contractor Fairfield Contracts to deliver the above quickly and efficiently.
With a watertight guarantee and a comprehensive range of no-quibble warranties, the client was safe in the knowledge that their building will be protected for years to come. The Elastadeck system has a guaranteed life of 15 years to first major maintenance but we can also demonstrate that using this aggregate has delivered almost 20 years of continuous use on balcony sites across the UK.
Product: Elastaseal Z
Product: Unicover
Product: Elastaseal Z
Be the first to receive exclusive news, expert advice, competition details and more.
Stay up to date with Tor Coatings and sign up to receive our email newsletter below.